Saltsjökvarn

Saltsjökvarn
Stockholm
Sweden
Project executed by
Envac Scandinavia
Project status
Completed

The construction of the district started in 1998 and about 600 flats in total was built.

An Envac Mobile System was installed, with about 20-25 flats sharing each inlet. With the Envac System, waste is transported underground, which meant that an area of 500m2 could be freed for selling. Cost of installing the Envac Mobile System was automatically covered.

Basic project information
CountrySweden
CityStockholm
In operation since1998
Project completed2003
Basic system data
Type of systemMobile Vacuum System
Application areaResidential area
Number of fractions1
Number of inlets25
Total metres of pipe1000
Type of wasteGeneral waste / Rest