Ibn Battuta Gate Offices and Hotel Spa

Ibn Battuta Gate Offices and Hotel Spa
Dubai
UAE
Project executed by
Envac Middle East
Project status
Completed
Keywords
UAE / Residential area

The project resembles the gateway into Dubai as you drive into the Emirate from Abu Dhabi.

The two wings one commercial offices and one a five star hotel managed by the Movenpick Hotels and Resorts. Envac’s solution is for the Movenpick Hotel alone and a system caters to the 150 room hotel and serviced apartment block and offers a clean and sound solution to modern day waste management.

Basic project information
CountryUAE
CityDubai
Project startup2009
In operation since2012
Project completed2010
Basic system data
Type of systemStationary Vacuum System
System subtypeSVS 400
Application areaResidential area, Hotel
Design capacity20 tons per day
Area size30 000 m2
Number of fractions1
Number of inlets2
Total metres of pipe250
Type of wasteMixed recyclables with paper