Can Gambús

Can Gambús
Sabadell
Spain
Project executed by
Envac Iberia SA
Project status
Ongoing
Keywords
Spain / Residential area

Can Gambus, a new quarter of Sabadell of 4.500 dwellings, was urbanized in 2007, but economical crisis has caused a delay of the construction project itself.

All pneumatic components are already installed (inlets, piping and terminal), but the Envac system has not yet been taken into operation.

The system is designed to collect 3 waste streams, with 244 valves and around 7 Km of pipe. It is foreseen to start it up in 2017.

Basic project information
CountrySpain
CitySabadell
Project startup2004
Project completed2007
Basic system data
Type of systemStationary Vacuum System
System subtypeSVS 500
Application areaResidential area
Design capacity15,8 tons per day
Area size82
Number of fractions3
Number of inlets244
Total metres of pipe7035
Type of wasteGeneral waste / Rest, Food/Organic waste, Packaging